What was done: dismantling of partitions, suspended ceilings, old utilities, design of all engineering systems, complete engineering and technical equipment, installation of an additional ventilation system on the roof of the building, turnkey finishing.
It was a real challenge for us! The construction of the facility took place during a difficult period from March to may 2020. despite the difficulties encountered during self-isolation, the project was implemented within the originally signed deadlines.
The room is an open office space, so the Customer was extremely important sound insulation characteristics of glass for sliding partitions, which further complicated the task.
in the current conditions of self-isolation, it was almost impossible to produce transformable glass partitions, with noise suppression of 45 DB, in 6 weeks, because the necessary production did not work. But not for our team!
With the maximum mobilization of all technical and human resources of the company, glass partitions with the necessary characteristics were produced and installed on time. Now important negotiations in the office International Bank events will be held in a comfortable environment!
What was done: dismantling of partitions, suspended ceilings, old utilities, design of all engineering systems, complete engineering and technical equipment, installation of an additional ventilation system on the roof of the building, turnkey finishing.
It was a real challenge for us! The construction of the facility took place during a difficult period from March to may 2020. despite the difficulties encountered during self-isolation, the project was implemented within the originally signed deadlines.
The room is an open office space, so the Customer was extremely important sound insulation characteristics of glass for sliding partitions, which further complicated the task.
in the current conditions of self-isolation, it was almost impossible to produce transformable glass partitions, with noise suppression of 45 DB, in 6 weeks, because the necessary production did not work. But not for our team!
With the maximum mobilization of all technical and human resources of the company, glass partitions with the necessary characteristics were produced and installed on time. Now important negotiations in the office International Bank events will be held in a comfortable environment!
What was done: dismantling of partitions, suspended ceilings, old utilities, design of all engineering systems, complete engineering and technical equipment, installation of an additional ventilation system on the roof of the building, turnkey finishing.
It was a real challenge for us! The construction of the facility took place during a difficult period from March to may 2020. despite the difficulties encountered during self-isolation, the project was implemented within the originally signed deadlines.
The room is an open office space, so the Customer was extremely important sound insulation characteristics of glass for sliding partitions, which further complicated the task.
in the current conditions of self-isolation, it was almost impossible to produce transformable glass partitions, with noise suppression of 45 DB, in 6 weeks, because the necessary production did not work. But not for our team!
With the maximum mobilization of all technical and human resources of the company, glass partitions with the necessary characteristics were produced and installed on time. Now important negotiations in the office International Bank events will be held in a comfortable environment!
What was done: dismantling of partitions, suspended ceilings, old utilities, design of all engineering systems, complete engineering and technical equipment, installation of an additional ventilation system on the roof of the building, turnkey finishing.
It was a real challenge for us! The construction of the facility took place during a difficult period from March to may 2020. despite the difficulties encountered during self-isolation, the project was implemented within the originally signed deadlines.
The room is an open office space, so the Customer was extremely important sound insulation characteristics of glass for sliding partitions, which further complicated the task.
in the current conditions of self-isolation, it was almost impossible to produce transformable glass partitions, with noise suppression of 45 DB, in 6 weeks, because the necessary production did not work. But not for our team!
With the maximum mobilization of all technical and human resources of the company, glass partitions with the necessary characteristics were produced and installed on time. Now important negotiations in the office International Bank events will be held in a comfortable environment!
What was done: dismantling of partitions, suspended ceilings, old utilities, design of all engineering systems, complete engineering and technical equipment, installation of an additional ventilation system on the roof of the building, turnkey finishing.
It was a real challenge for us! The construction of the facility took place during a difficult period from March to may 2020. despite the difficulties encountered during self-isolation, the project was implemented within the originally signed deadlines.
The room is an open office space, so the Customer was extremely important sound insulation characteristics of glass for sliding partitions, which further complicated the task.
in the current conditions of self-isolation, it was almost impossible to produce transformable glass partitions, with noise suppression of 45 DB, in 6 weeks, because the necessary production did not work. But not for our team!
With the maximum mobilization of all technical and human resources of the company, glass partitions with the necessary characteristics were produced and installed on time. Now important negotiations in the office International Bank events will be held in a comfortable environment!
What was done: dismantling of partitions, suspended ceilings, old utilities, design of all engineering systems, complete engineering and technical equipment, installation of an additional ventilation system on the roof of the building, turnkey finishing.
It was a real challenge for us! The construction of the facility took place during a difficult period from March to may 2020. despite the difficulties encountered during self-isolation, the project was implemented within the originally signed deadlines.
The room is an open office space, so the Customer was extremely important sound insulation characteristics of glass for sliding partitions, which further complicated the task.
in the current conditions of self-isolation, it was almost impossible to produce transformable glass partitions, with noise suppression of 45 DB, in 6 weeks, because the necessary production did not work. But not for our team!
With the maximum mobilization of all technical and human resources of the company, glass partitions with the necessary characteristics were produced and installed on time. Now important negotiations in the office International Bank events will be held in a comfortable environment!
What was done: dismantling of partitions, suspended ceilings, old utilities, design of all engineering systems, complete engineering and technical equipment, installation of an additional ventilation system on the roof of the building, turnkey finishing.
It was a real challenge for us! The construction of the facility took place during a difficult period from March to may 2020. despite the difficulties encountered during self-isolation, the project was implemented within the originally signed deadlines.
The room is an open office space, so the Customer was extremely important sound insulation characteristics of glass for sliding partitions, which further complicated the task.
in the current conditions of self-isolation, it was almost impossible to produce transformable glass partitions, with noise suppression of 45 DB, in 6 weeks, because the necessary production did not work. But not for our team!
With the maximum mobilization of all technical and human resources of the company, glass partitions with the necessary characteristics were produced and installed on time. Now important negotiations in the office International Bank events will be held in a comfortable environment!